Asphalt Paving & Patching

General Information
Tentative Start Date: June 2015
Tentative Completion Date: November 2015
Project Manager:  David Trais 
Contractor: Schroeder Asphalt Service, Inc.
Awarded Contract Amount: $1,484,000
Funding Sources:  Capital Project
Bid Information

Contact Information
Contact David Trais, Project Manager at the Village of Lombard Public Works Department, at (630) 620-5740 or by email at traisd@villageoflombard.org.

Project Information
Project Limits: Work will be performed in various locations throughout the Village of Lombard.  

This Project Includes: 
1. American Disability Act (ADA) improvements at intersections.
2. Concrete removal and replacement as needed. Spot repairs will be done on curb and gutter. Sidewalk removal and replacement will only be done at intersections for this project.
3. Driveway aprons (sidewalk to curb) will be removed and replaced, if caused by damage, due to project related construction, i.e., such as new sidewalk or curb placement.
4. Structure adjustments or reconstructions in roadway or curb line.
5. Full-depth patching of utility repairs at various locations throughout Village limits.
6. 2” surface removal, pavement patching and surface overlay of full blocks to be done by contractor and Village crews.
7. 3-1/2” to 4” full-depth pavement removal, base repairs, roadway preparation, binder course placement by contractor.  Village crews will place surface course on these streets.
8. Restoration by contractor.

Project Schedule: Work is to be substantially completed within 100 calendar days of Notice to Proceed.

Communications