| Project Name |
Bids Opened |
| 2010 Driveway Apron, Curb, And Sidewalk Restoration |
5/8/2009 |
| Main Street Soil Remediation Stage 2 |
4/24/2009 |
| 2010 Cracksealing Program |
4/17/2009 |
| 2010 Concrete Rehab And Utility Cuts Patching |
4/3/2009 |
| 2009 Sewer Lining |
3/24/2009 |
| Complete Maintenance of Traffic Control Equipment |
3/23/2009 |
| Special Assessment 217B |
2/26/2009 |
| Olde Towne East Ph. 4 |
2/10/2009 |
| 2009 Sewer Televising And Cleaning |
9/9/2008 |
| Village Complex Paving |
8/13/2008 |
| 2009 Asphalt Paving And Patching Program |
7/22/2008 |
| 2009 Cracksealing Program |
6/27/2008 |
| Main Street Soil Remediation |
6/9/2008 |
| 2009 Concrete Rehab and Utility Cuts Patching |
6/9/2008 |
| Water and Sewer System Supplies |
5/23/2008 |
| Well Repairs |
5/23/2008 |
| 2008 Catch Basin Cleaning |
5/23/2008 |
| 2008 Water/Sewer System Supplies |
5/23/2008 |
| South Booster Station Water Transmission Main |
5/2/2008 |
| South Booster Station |
5/2/2008 |
| Main St. Lighting |
4/8/2008 |
| Main Street Access Improvements |
4/4/2008 |
| Main St. STP |
3/7/2008 |
| Olde Towne East Phase 3 |
2/26/2008 |
| Special Assessment 217A |
2/11/2008 |
| FY2008 Driveway Apron, Curb, and Sidewalk Restoration |
4/10/2007 |
| Water Valve Exercising Project |
4/6/2007 |
| Catch Basin Cleaning Project |
4/6/2007 |
| Well No. 7 Repairs |
4/6/2007 |
| The FY 2008 Asphalt Paving and Patching Program |
4/6/2007 |
| FY2008 Concrete Rehab and Utility Cuts Patching |
4/5/2007 |
| Northeast Lombard Area Sanitary Sewer and Watermain Loop Phase II |
3/27/2007 |
| Orchard Terrace Parking Lot |
3/6/2007 |
| Northeast Lombard Area Sanitary Sewer Connections |
|
| Northeast Lombard Area Sanitary Sewer Connections Phase II |
|
| 2009 Driveway Apron And Sidewalk Restoration |
|
| |
|
| |
|
|
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|