Community Updates Home
The original item was published from 9/9/2022 12:00:35 PM to 9/11/2022 8:07:50 AM.

Community Updates

Trending News

Posted on: September 9, 2022

[ARCHIVED] 2022 Asphalt Paving & Patching Program Begins

Asphalt

The 2022 Asphalt Paving and Patching Program will begin Monday, September 12th.   The project will involve milling and resurfacing of selected streets; concrete removal and replacement work as needed, which will primarily be spot curb replacement and sidewalk removal with ADA (American Disability Act) improvements at intersections; drainage structure adjustments; patching of utility repairs; pavement markings; and parkway restoration

The project limits cover various streets throughout the VIllage including: 

  • Arboretum Drive – cul-de-sac to Main Street
  • Chase Avenue – South Broadway to Division Street
  • Edson Avenue – Wilson Avenue to Central Avenue
  • Edson Street – 22nd Street to Arboretum Drive
  • Elizabeth Street – Gazebo Lane to Arboretum Drive
  • Gazebo Lane – Edson Street to Lincoln Street
  • LaLonde Avenue – 17th Street to 18th Street
  • Lincoln Street – 22nd Street to Arboretum Drive
  • Lodge Lane – North Broadway to South Broadway
  • North Broadway – Grace Street to dead end east
  • Kenilworth Court – private street to Kenilworth
  • Porter Court – cul-de-sac to 18th Street
  • School Street – South Broadway to Division Street
  • South Broadway – Grace Street to dead end east
  • Stewart Avenue – 17th Street to 18th Street
  • Taylor Road – dead end west to Main Street
  • Wilson Avenue – Main Street to Hammerschmidt Avenue
  • 13th Street – cul-de-sac to Highland Avenue
  • 16th Place – 17th Street to 17th Street
  • 17th Place – cul-de-sac to cul-de-sac
  • 17th Street – Stewart Avenue to Fairfield Avenue
  • 18th Street – Stewart Avenue to Fairfield Avenue

                               

Full-depth Patching will be done at the following locations:

  • 263 N. GraceStreet
  • 387 N. Grace Street
  • 500 W. St. Charles Road
  • 52 W. Taylor Road
  • 56 W. Taylor Road
  • 901 S. Westmore-Meyers Road

For full details on the scope of the project and to find out what roads are scheduled for resurfacing, visit https://www.villageoflombard.org/512/6337/FY22-Asphalt-Paving-Patching-Program

 

Facebook Twitter Email

Other News in Trending News

Tis the Season for Safety 395

Holiday Shopping Crime Prevention Tips

Posted on: November 28, 2023
Thanksgiving Enforcement Results graphic with drive sober logo

Thanksgiving Enforcement Results

Posted on: November 28, 2023
Keep the Wreath Red - 395

Keep the Wreath Red This Holiday Season

Posted on: November 15, 2023
photo of fire flames over controlled burn with overlay text

Fall 2023 Controlled Burns

Posted on: November 20, 2023
Holiday Light Recycling (395 x 305 px)

Holiday Light Recycling

Posted on: November 20, 2023
Hand holding paper gift bags with text about shopping small and local

Shop Small this Small Business Saturday

Posted on: November 21, 2023
raking leaves

Lombard's Free Leaf Collection Program

Posted on: October 17, 2023
Colorful fall leaves on storm drain inlet

Help Keep Leaves Away from Storm Drains

Posted on: October 24, 2023
9M Routine - General  (395 x 305 px)

Prevent Thefts With the 9PM Routine

Posted on: October 6, 2023
2023 Seniors of the Year with Village President Giagnorio and Village Trustee Militello

2023 Seniors of the Year Announced

Posted on: October 5, 2023
FOIA book on table with white keyboard

Village Launches New FOIA Platform

Posted on: September 6, 2023