North Grace Street Resurfacing - East St. Charles Road to Il Route 64 (North Avenue)

General Information

Design Engineering
Tentative Start Date: April 18, 2024
Completion Date: March 2026
Project Manager: Ray Schwab, Civil Engineer II
Engineer: Baxter & Woodman Consulting Engineers
Awarded Contract Amount: $267,200.00
Surveyor: Baxter & Woodman Consulting Engineers
Geotechnical Consultant: Rubino Engineering, Inc.
Sewer Televising: SewerTech LLC
Funding Sources: Construction Fund (Local)

 Construction
Tentative Start Date:   Early June 2026
Tentative Completion Date:  October 2026
Project Manager:  Ray Schwab, Civil Engineer II
State Awarded Contract
Bid Opening: April 24, 2026
Contractor:  TBD
Awarded Contract Amount:   TBD
Funding Sources: Surface Transportation (Federal) and Construction Fund (Local)

Contact Information 

Contact:  Ray Schwab, Civil Engineer II/Project Manager
Village of Lombard Public Works Department, (630) 620-5740 
schwabr@villageoflombard.org.

Communications

Newsletters & Notices: A public information meeting regarding construction will take place during the winter of 2025/2026. Residents/property owners will be notified as the date approaches. The “Notify Me” feature and periodic newsletters will be issued. Hand distributed notices will be issued as needed.

3/10/26 Resident Letter

Project Information 

Project Limits: North Grace Street (East St. Charles Road to North Avenue (IL Route 64))
 Scope of Work:

  1. Roadway Improvements
    • Curb and gutter removal and replacement
    • Driveway apron replacement
    • Asphalt pavement resurfacing and patching
    • Roadway, Parking and Bike Path Striping
  2. Pedestrian & Bicycle Enhancements
    • Construction of on and off-road shared-use paths:
      • From the Great Western Trail to Prairie Avenue
      • From Sunset Avenue to the Lombard Lagoon
  3. Sidewalk, Drainage and Landscaping
    • Sidewalk removal and replacement
      • Drainage improvements
      • Selected tree removal and replacement
      • Parkway re-seeding
      • New trees to be planted in Fall 2026

These improvements aim to enhance safety, accessibility, and aesthetics along North Grace Street while providing new and improved recreational paths for pedestrians and cyclists.

Anticipated Project Schedule: 

Bid Opening: April 24, 2026

Project Start: June 2026

Project Award: May 2026

Project Completion: October 2026

FAQ’s

Why is this project necessary? The current infrastructure is reaching the end of its service life and needs to be brought up to current Village standards.
How does this benefit the Village? The benefits of the project will be an improved pavement through resurfacing and patching, and enhanced pedestrian and bicycle routes through the removal of gaps by constructing off-road shared-use paths and bike lanes.
Will this impact traffic and parking? 
There may be periods of time that residents will not be able to access their driveways due to underground utility construction, roadway excavation, curb and gutter installation, and roadway paving. Overnight parking passes will be distributed prior to resident being out of their driveways overnight or for extended periods of time.